- Pullen Gulch THP -


Background - Equipment - Links - Cal Poly - Legacy


This shows one of the Madill 120's almost finished with the first unit of the Pullen Gulch THP. This was a clear-cut unit, however all of the standing timber running up the draws was the result of a 30 foot buffer zone on all class 3 watercourses in the THP.

On the right side of the picture you can see the down timber yet to be skidded.

1